Military

Navy aircraft carrier Gerald R. Ford may be ready in April

Thursday, a US Navy spokeswoman said the Gerald R. Ford aircraft carrier may be delivered as soon as April of this year. The ship is the most technologically advanced and most expensive aircraft carrier ever built and represents a new class of carrier called the ‘Ford Class’.

Watch the Gerald R. Ford Christening

You've reached your daily free article limit.

Subscribe and support our veteran writing staff to continue reading.

Get Full Ad-Free Access For Just $0.50/Week

Enjoy unlimited digital access to our Military Culture, Defense, and Foreign Policy coverage content and support a veteran owned business. Already a subscriber?

Thursday, a US Navy spokeswoman said the Gerald R. Ford aircraft carrier may be delivered as soon as April of this year. The ship is the most technologically advanced and most expensive aircraft carrier ever built and represents a new class of carrier called the ‘Ford Class’.

Watch the Gerald R. Ford Christening

Newport News Shipbuilding, the only shipyard that builds nuclear carriers for the Navy released a statement today concerning the $12.9 billion, first in class ship:

As the Navy recently stated, significant progress in resolving first-of-class issues have been made on Gerald R. Ford and we have resumed critical path testing in support of sea trials readiness.  We remain focused on achieving our milestones of builder’s sea trials, acceptance trials, and delivery as quickly and efficiently as possible.”

The Navy has scheduled sea trials in March and April, said Capt. Thurraya Kent. Delivery to the Navy would take place in April, pending the results of sea trials. – Daily Press

Watch Testing of the Ford’s New Electromagnetic Catapult Launch System

Designated CVN-78, the Gerald R. Ford marks the beginning of the ‘Ford Class’ carriers. It is the first new design for an aircraft carrier since the USS Nimitz (CVN 68) and the ship is estimated to have a 50 year service life. The Ford is also the first Navy carrier to ever be totally designed in 3D modeling at full scale representing a breakthrough in design technology.

The ship has overcome numerous technological issues which has led to delays and cost overruns. The Ford was originally scheduled to be delivered in 2015.

Susan Ford Bales, ship’s sponsor for the aircraft carrier USS Gerald R. Ford (CVN-78), tours Dry Dock No. 12 at Newport News Shipbuilding prior to flooding the basin and floating Gerald R. Ford for the first time. Photo via Wikimedia Commons

Featured Image by Newport News Shipbuilding

 

This article is courtesy of Fighter Sweep.

 

About SOFREP News Team View All Posts

The SOFREP News Team is a collective of professional military journalists. Brandon Tyler Webb is the SOFREP News Team's Editor-in-Chief. Guy D. McCardle is the SOFREP News Team's Managing Editor. Brandon and Guy both manage the SOFREP News Team.

COMMENTS

You must become a subscriber or login to view or post comments on this article.

More from SOFREP

REAL EXPERTS.
REAL NEWS.

Join SOFREP for insider access and analysis.

TRY 14 DAYS FREE

Already a subscriber? Log In