North America

The cheapest way to build Trump’s wall

The cheapest way to build Trump’s wall

The spring of 2008 was a grim time for the U.S. military in Baghdad. Not least among the problems were rockets raining down on the Green Zone, which housed government offices and foreign embassies, from a suburb of the Iraqi capital called Sadr City. American forces fought back and captured launch locations, but the missiles kept falling.

That’s when the military opted for a strategy that would resonate, years later, with the border-control philosophy of President Donald Trump: building a big wall.

In just six weeks, U.S. and Iraqi soldiers placed 3,000 precast concrete slabs, each standing 12 feet high and weighing about 9 tons, to block enemy fighters from important positions. It wasn’t easy. The militia tried to disrupt the construction with improvised explosive devices and snipers, according to a paper published by the Rand Corp. Gunmen routinely took aim at personnel who had the unenviable job of climbing to the top of the barriers and freeing each concrete slab from the cables of construction cranes. But the wall went up quickly, and the missiles stopped.

You've reached your daily free article limit.

Subscribe and support our veteran writing staff to continue reading.

Get Full Ad-Free Access For Just $0.50/Week

Enjoy unlimited digital access to our Military Culture, Defense, and Foreign Policy coverage content and support a veteran owned business. Already a subscriber?

The spring of 2008 was a grim time for the U.S. military in Baghdad. Not least among the problems were rockets raining down on the Green Zone, which housed government offices and foreign embassies, from a suburb of the Iraqi capital called Sadr City. American forces fought back and captured launch locations, but the missiles kept falling.

That’s when the military opted for a strategy that would resonate, years later, with the border-control philosophy of President Donald Trump: building a big wall.

In just six weeks, U.S. and Iraqi soldiers placed 3,000 precast concrete slabs, each standing 12 feet high and weighing about 9 tons, to block enemy fighters from important positions. It wasn’t easy. The militia tried to disrupt the construction with improvised explosive devices and snipers, according to a paper published by the Rand Corp. Gunmen routinely took aim at personnel who had the unenviable job of climbing to the top of the barriers and freeing each concrete slab from the cables of construction cranes. But the wall went up quickly, and the missiles stopped.

 

OTAY MESA, CA - JULY 25: Members of the California National Guard prepare to bury plastic pipes for housing electrical wiring along the U.S.-Mexico Border July 25, 2006 in Otay Mesa, California. Approximately 1,000 volunteer Guardsmen are stationed along the California-Mexico border as part of Operation Jump Start, which is providing support for the border patrol agents by repairing fences, improving roads and manning surveillance cameras. The Guard are prohibited from engaging in overt law enforcement. (Photo by Sandy Huffaker/Getty Images)

Members of the California National Guard prepare to build a fence along the U.S.-Mexico border in Otay Mesa, Calif., on July 25, 2006. (Sandy Huffaker/Getty Images)

Read the whole story from Bloomberg.
Editorial Cartoon courtesy of Robert L. Lang
About SOFREP News Team View All Posts

The SOFREP News Team is a collective of professional military journalists. Brandon Tyler Webb is the SOFREP News Team's Editor-in-Chief. Guy D. McCardle is the SOFREP News Team's Managing Editor. Brandon and Guy both manage the SOFREP News Team.

COMMENTS

You must become a subscriber or login to view or post comments on this article.

More from SOFREP

REAL EXPERTS.
REAL NEWS.

Join SOFREP for insider access and analysis.

TRY 14 DAYS FREE

Already a subscriber? Log In